Infrastructure Transformation - ACVEDA Consulting

Professionnal Services

Infrastructure Transformation

Infrastructure Transformation

Description de l'image

In a context of mergers, acquisitions, and entity separations, the success of an IT project relies on strategic infrastructure management. Well-executed IT transformation minimizes interruptions, optimizes performance, and generates savings by aligning systems with the company's objectives.

Optimize your IT transformations with strategic management that minimizes risks. For a separation (Carve-out) or an integration (Carve-in), we assess your infrastructure, define requirements, and ensure a smooth transition with robust business continuity plans. Our tailored solutions guarantee the operability of your critical systems while optimizing your infrastructure.

  • Benefits

    • Comprehensive risk management: We anticipate and manage every potential risk of IT transformation, minimizing disruptions and ensuring continuity of essential services.
    • Cost optimization: By identifying and eliminating redundancies in IT infrastructure, we generate substantial savings for your business.
    • Improved operational efficiency: Our interventions optimize existing processes and systems, increasing your teams' productivity and response time.
    • Enhanced reliability and performance: We implement robust and scalable architectures that guarantee quick response times and high availability of critical systems.
    Benefits Image
  • Methodology

    1. Initial assessment: We start with a thorough audit of existing or acquired IT infrastructure. This step identifies interdependencies, potential weaknesses, and the resources needed for a successful transition. We also analyze system compatibility in case of a new entity integration.
    2. Strategic planning: A detailed migration plan is developed, integrating essential aspects such as security, business continuity (BCP), and disaster recovery (DRP). This plan considers resources, timelines, and strategic project objectives, ensuring alignment among all stakeholders.
    3. Migration and optimization: Migration is implemented progressively and controlled, with testing at each step to ensure optimal performance. We optimize existing systems, eliminate redundant elements, and adjust the architecture to achieve maximum efficiency.
    4. Post-migration support: After migration is complete, we offer post-implementation monitoring to assess the performance of new systems and ensure the initial objectives are met. We also collect user feedback and adjust if necessary, while providing support to teams to facilitate change adoption.
    Methodology Image
  • Deliverables

    • Detailed audit report: Document describing the state of existing IT infrastructure, identifying interdependencies and potential risks, along with initial recommendations.
    • Migration plan and target architecture: A comprehensive guide for migration with optimized IT architecture, including key steps, stakeholder responsibilities, and tracking KPIs.
    • Business continuity and disaster recovery plans: BCP and DRP documents to ensure continuity of operations in case of disruptions. These plans detail preventive actions and recovery protocols.
    • Optimization and adjustment documentation: A summary of all optimizations performed, including performance improvements and adjustments for critical systems. This document also serves as a reference for future infrastructure interventions.
    Deliverables Image
  • KPIs

    • Migration timeline adherence: Measures adherence to schedule for each migration phase. Tracking these KPIs allows us to adjust resources if necessary to avoid delays.
    • Infrastructure cost reduction rate: Monitors the financial optimization of infrastructure, including operating cost reduction and removal of redundant resources.
    • Critical system availability: Measures system availability and downtime after migration, with a target of 99.9% availability for critical systems.
    • Stakeholder satisfaction rate: Qualitative evaluation of feedback from stakeholders and end users. A high satisfaction rate indicates successful change adoption and enhanced infrastructure performance.
    KPIs Image
  • FAQ

    • How do you ensure business continuity during migration?
    • What are the critical steps in an IT separation or integration?
    • How do you minimize risks during migration?
    • What is the typical timeframe for an infrastructure transformation project?
    • Do you provide ongoing support after migration?
    FAQs Image